top of page

Project posts

BGR_hex_topp_Liten.png

Winter secured in Ystad: New build with “everything included”

  • info1953811
  • Jun 25
  • 1 min read

In Ystad, we’ve completed an impressive new build equipped with everything needed to ensure efficient and reliable operation. Design, electrical cabinets, programming, and commissioning were all carried out on site, and we installed two floor cabinets, each equipped with Siemens S7-1500 systems.


This comprehensive installation ensures the facility is well prepared to meet the challenges of winter with confidence.


nybyggd anläggning

elskåp

 
 
bottom of page